Donald Court Bulkhead

Project Details

Client: Town of Brookhaven Highway Department

Location: Huntington, NY

Project Summary

LKMA prepared permitting and design plans for the replacement of a deteriorated bulkhead timber bulkhead at the end of Donald Court.  Project also included the design of a vegetated swale meant to treat stormwater runoff from the roadway prior to entering the adjacent canal.  Pollutant loading calculations were also provided to the Town that identified the pollutant removal capability of the system.

donald_court

Donald Court Road Ending with Vegetated Swale for Pollution Mitigation